Difference between revisions of "OL-414/TYQ-35"

From RadioNerds
Jump to navigation Jump to search
Line 2: Line 2:
 
level SCC. The planning shelter contains two workstations used to plan and control the movement of the MSE system, and to determine the logistical and personnel status of the NCs. A trailer-mounted 5 kw diesel  generator  [[PU-751/M]]  provides  115  VAC,  50-60  HZ  electrical power.
 
level SCC. The planning shelter contains two workstations used to plan and control the movement of the MSE system, and to determine the logistical and personnel status of the NCs. A trailer-mounted 5 kw diesel  generator  [[PU-751/M]]  provides  115  VAC,  50-60  HZ  electrical power.
 
Major Components
 
Major Components
*1 Shelter [[S-250]]
+
*1 Shelter [[S-250]]                                  *[[File:OL-414.TYQ-35(V)2.jpg|right|500px]]
 
*1 Environmental Control Unit ([[ECU]])
 
*1 Environmental Control Unit ([[ECU]])
 
*1 [[DNVT]] [[TA-1035/U]]
 
*1 [[DNVT]] [[TA-1035/U]]
Line 10: Line 10:
 
*1 Communications Terminal [[AN/UGC-74]]
 
*1 Communications Terminal [[AN/UGC-74]]
 
*1 Net Control Device [[KYX-15]]
 
*1 Net Control Device [[KYX-15]]
 
[[File:OL-414.TYQ-35(V)2.jpg|right|500px]]
 

Revision as of 12:57, 17 February 2016

The OL-414/TYQ-35 is the planning shelter. This unit is only part of the corps level SCC. It does not deploy with a division level SCC. The planning shelter contains two workstations used to plan and control the movement of the MSE system, and to determine the logistical and personnel status of the NCs. A trailer-mounted 5 kw diesel generator PU-751/M provides 115 VAC, 50-60 HZ electrical power. Major Components