Difference between revisions of "750"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
* 11-756 | * 11-756 | ||
* 11-757 Principles of Line Fault Location 2 Aug. 1948 | * 11-757 Principles of Line Fault Location 2 Aug. 1948 | ||
− | * 11-758 | + | * 11-758 Standard Practices for the Preparation of Signal Service Fixed Wire and Radio Communication Plant Engineering Drawings and Uses of Symbols abbreviations and Terms Dept of the Army Dec.1, 1953 |
* 11-759 Theory and Measurement of Pulse Radar System Performance, 24 Nov. 1948 | * 11-759 Theory and Measurement of Pulse Radar System Performance, 24 Nov. 1948 | ||
* 11-760 | * 11-760 | ||
− | + | * 11-791 Power Units PE-162-A, PE-162-B, and PE-162-C Dept. of the Army, Jan. 1, 1963 | |
+ | |||
To [[800]] [[900]] [[1000]] | To [[800]] [[900]] [[1000]] |
Revision as of 21:15, 15 March 2016
- 11-750 Radar Antijamming for the Operator. War Dept. 26 Oct. 1944
- 11-751 Radar Antijamming for the Technician. War Dept. Nov. 1944
- 11-751 Radar Antijamming for the Technician. Depts of the Army and the Air Force 1955 TM 11-751. TO 12-1-25 1955
- 11-752
- 11-753
- 11-754
- 11-755 Grounds, Grounding Procedure, & Protective Devices for Wire Communication Equipment War Dept. Apr.1945
- 11-756
- 11-757 Principles of Line Fault Location 2 Aug. 1948
- 11-758 Standard Practices for the Preparation of Signal Service Fixed Wire and Radio Communication Plant Engineering Drawings and Uses of Symbols abbreviations and Terms Dept of the Army Dec.1, 1953
- 11-759 Theory and Measurement of Pulse Radar System Performance, 24 Nov. 1948
- 11-760
- 11-791 Power Units PE-162-A, PE-162-B, and PE-162-C Dept. of the Army, Jan. 1, 1963
To 800 900 1000